The Lean Construction Blog's Podcast

Episode 19 - Gerry McCabe : Increasing Reliability of Cost Estimates

September 08, 2022 Dick Bayer Episode 19
Episode 19 - Gerry McCabe : Increasing Reliability of Cost Estimates
The Lean Construction Blog's Podcast
More Info
The Lean Construction Blog's Podcast
Episode 19 - Gerry McCabe : Increasing Reliability of Cost Estimates
Sep 08, 2022 Episode 19
Dick Bayer

Send us a Text Message.

Watch on Youtube

Gerry McCabe is the Managing Director of Turner and Townsend in Canada.  He was a founding member of his own company that was acquired by Turner and Townsend in 2010.  He grew up in Belfast during the “troubles.”  He came to Canada to visit relatives originally and decided to stay.  He’s a Chartered Quantity Surveyor and one of the most interesting people you’ll meet.  Come join as we chat about how to estimate the cost of something that hasn’t been designed and what to look for in Canadian Supply Chains in the next 5 years.

Show Notes

Send us a Text Message.

Watch on Youtube

Gerry McCabe is the Managing Director of Turner and Townsend in Canada.  He was a founding member of his own company that was acquired by Turner and Townsend in 2010.  He grew up in Belfast during the “troubles.”  He came to Canada to visit relatives originally and decided to stay.  He’s a Chartered Quantity Surveyor and one of the most interesting people you’ll meet.  Come join as we chat about how to estimate the cost of something that hasn’t been designed and what to look for in Canadian Supply Chains in the next 5 years.