The Lean Construction Blog's Podcast

Episode 21 - Andreas Phelps : An intentional life, intentionally lean

• Dick Bayer • Episode 21

Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.

0:00 | 1:16:40

Watch on Youtube.

Dr. Andreas Phelps is an original thinker of the first order.  He has a phd in Construction Management from Penn State University and is the CEO of the Collective Potential.  He lives with his talented wife and two incredible kids off the grid in a tiny house in the Bay Area.  His Tiny House Presentation at the 2021 LCI Congress was so popular he was brought back to this year’s Congress to keynote the opening of the Congress, speaking on intentionality and leadership.  Join us as we discuss living an intentional life that is intentionally lean.