The Lean Construction Blog's Podcast
A podcast dedicated to stories, case studies and lessons learned of applying Lean Construction from around the world.
The Lean Construction Blog's Podcast
Episode 3 - George Zettel : Lessons from a Lean Evangelist at Turner Construction
•
Dick Bayer
•
Episode 3
George Zettel was drafted into being the Turner representative at a meeting called by Sutter Health back in 2004. He was immediately hooked on the possibility of a new value to Owners--one that his current Owner was in fact demanding. We explore George's original journey as a lean advocate inside a very large, very successful, very traditional American contractor.
Watch the episode on Youtube.