The Lean Construction Blog's Podcast

Episode 3 - George Zettel : Lessons from a Lean Evangelist at Turner Construction

• Dick Bayer • Episode 3

Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.

0:00 | 57:33

George Zettel was drafted into being the Turner representative at a meeting called by Sutter Health back in 2004. He was immediately hooked on the possibility of a new value to Owners--one that his current Owner was in fact demanding. We explore George's original journey as a lean advocate inside a very large, very successful, very traditional American contractor.

Watch the episode on Youtube.