The Lean Construction Blog's Podcast

Episode 4 - Todd Zabelle: Let's Talk About Productivity in Construction for the 21st Century

July 11, 2021 Dick Bayer Episode 4
Episode 4 - Todd Zabelle: Let's Talk About Productivity in Construction for the 21st Century
The Lean Construction Blog's Podcast
More Info
The Lean Construction Blog's Podcast
Episode 4 - Todd Zabelle: Let's Talk About Productivity in Construction for the 21st Century
Jul 11, 2021 Episode 4
Dick Bayer

Send us a Text Message.

Todd Zabelle was among the original founders of LCI.  Glenn Ballard worked with him briefly at Pacific Contractors back in the '90s.  Todd has spent his career thinking about enhancing productivity in design and construction and founded the Project Production Institute to provide a forum for other like minded folks.  He's not doing the 1920 version of productivity of Fredrick Winslow Taylor and he's not doing the Critical Path predictability of the 1950's.  He's truly moved on to operational science and the creation of real production in construction.  Join us to see how he did it.

Watch episode on Youtube.

Show Notes

Send us a Text Message.

Todd Zabelle was among the original founders of LCI.  Glenn Ballard worked with him briefly at Pacific Contractors back in the '90s.  Todd has spent his career thinking about enhancing productivity in design and construction and founded the Project Production Institute to provide a forum for other like minded folks.  He's not doing the 1920 version of productivity of Fredrick Winslow Taylor and he's not doing the Critical Path predictability of the 1950's.  He's truly moved on to operational science and the creation of real production in construction.  Join us to see how he did it.

Watch episode on Youtube.