Todd Zabelle was among the original founders of LCI. Glenn Ballard worked with him briefly at Pacific Contractors back in the '90s. Todd has spent his career thinking about enhancing productivity in design and construction and founded the Project Production Institute to provide a forum for other like minded folks. He's not doing the 1920 version of productivity of Fredrick Winslow Taylor and he's not doing the Critical Path predictability of the 1950's. He's truly moved on to operational science and the creation of real production in construction. Join us to see how he did it.
Watch episode on Youtube.
Todd Zabelle was among the original founders of LCI. Glenn Ballard worked with him briefly at Pacific Contractors back in the '90s. Todd has spent his career thinking about enhancing productivity in design and construction and founded the Project Production Institute to provide a forum for other like minded folks. He's not doing the 1920 version of productivity of Fredrick Winslow Taylor and he's not doing the Critical Path predictability of the 1950's. He's truly moved on to operational science and the creation of real production in construction. Join us to see how he did it.
Watch episode on Youtube.