The Lean Construction Blog's Podcast
A podcast dedicated to stories, case studies and lessons learned of applying Lean Construction from around the world.
The Lean Construction Blog's Podcast
Episode 21 - Andreas Phelps : An intentional life, intentionally lean
November 13, 2022
•
Dick Bayer
•
Episode 21
Watch on Youtube.
Dr. Andreas Phelps is an original thinker of the first order. He has a phd in Construction Management from Penn State University and is the CEO of the Collective Potential. He lives with his talented wife and two incredible kids off the grid in a tiny house in the Bay Area. His Tiny House Presentation at the 2021 LCI Congress was so popular he was brought back to this year’s Congress to keynote the opening of the Congress, speaking on intentionality and leadership. Join us as we discuss living an intentional life that is intentionally lean.