The Lean Construction Blog's Podcast

Episode 25 - Stuart Eckblad : Delivering a $4 Billion Capital Program at UCSF using Lean IPD

• Dick Bayer • Episode 25

Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.

0:00 | 1:01:00

Watch on Youtube.

Stuart Eckblad has been thinking divergently since he left home for Kent State to pursue a degree in architecture.  That led him to the University of Wisconsin where he received a masters degree in Environmental Design.  He was particularly interested in the effect of color on human beings.   That kind of curiosity inspired a long career dedicated to moving from traditional delivery to a new vocabulary in the built environment, one that focused on collaboration, integration, purpose and innovation.  Join us for a glimpse of the life that led Stuart to found the Center for Innovation in Construction and lead the current team building the $4.5 B Parnassus Heights hospital program.