The Lean Construction Blog's Podcast
A podcast dedicated to stories, case studies and lessons learned of applying Lean Construction from around the world.
The Lean Construction Blog's Podcast
Episode 25 - Stuart Eckblad : Delivering a $4 Billion Capital Program at UCSF using Lean IPD
May 04, 2023
•
Dick Bayer
•
Episode 25
Watch on Youtube.
Stuart Eckblad has been thinking divergently since he left home for Kent State to pursue a degree in architecture. That led him to the University of Wisconsin where he received a masters degree in Environmental Design. He was particularly interested in the effect of color on human beings. That kind of curiosity inspired a long career dedicated to moving from traditional delivery to a new vocabulary in the built environment, one that focused on collaboration, integration, purpose and innovation. Join us for a glimpse of the life that led Stuart to found the Center for Innovation in Construction and lead the current team building the $4.5 B Parnassus Heights hospital program.