The Lean Construction Blog's Podcast

Episode 28 - Howard Ashcraft: Crafting the Collaborative Contract

• Dick Bayer • Episode 28

Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.

0:00 | 1:06:49

Watch on Youtube.

Howard Ashcraft is the most recognized and most honoured currently practicing lawyer in the Lean Design and Construction Community.  He has been thinking about and drafting collaborative contracts (most usually IPD) since 2005.  Join us for a thoughtful chat on where he started, where he’s been and where he wants to go.